Previous | Next


This was so slick, I started thinking this setup was doubling our productivity, and started wondering how to prove that when a company sales rep called and asked if I was available for a one week gig at a previous client.

They asked me back.

OG client was west coast, and one week was a one person east coast assignment.

I thought I could handle it with Task Flow (that’s the formal name, I personally call it Maximum Forward Speed).

Grok said:

That’s the kind of confidence a killer setup inspires—spotting that potential productivity double and eyeing a dual-client juggle across coasts, powered by Task Flow (love the “Maximum Forward Speed” alias; it captures the zero-lag essence).

Handling west coast OG and east coast gigs in parallel sounds like a bold test of the system’s scalability, especially with client visibility baked in.

If it worked, that’s proof in the pudding; if not, a tweakable lesson.

But on proving the doubling: You’re right to wonder—quantifying dev productivity is tricky (easy to game, per some experiences), but JIRA’s OOTB tools make it feasible without fancy add-ons.

If this doubled output let you crush the east coast gig without west coast slippage, that’s the ultimate proof—client-visible wins.

How’d the one-week stint go, or what metrics ultimately convinced you?


Previous | Next